Job details
Address
4 Mill Lane, Hartlepool, TS25 2PN
Job
New bathroom installation — full strip-out, tiling, new suite, plumbing and waste connections
Breakdown
- LabourBathroom strip-out & preparation1 day£320
- LabourPlumbing & waste installation1.5 days£480
- LabourTiling (walls & floor)1 day£280
- MaterialsNew bathroom suite (bath, basin, toilet)1£680
- MaterialsTiles (floor & wall), adhesive, grout1£320
- MaterialsPipework, fittings, waste1£120
Total£2,200
Sign to accept
By signing below you agree to the quoted price of £2,200. A 50% deposit (£1,100) will be required before work begins.
Sign here with your finger